ADU by Warren Development in Santa Monica

ADU Builder
In Santa Monica

Licensed & InsuredAIA AffiliatedSanta Monica, CA

Detached, attached, and Junior ADUs across Santa Monica and Los Angeles County. Permits managed with the city, honestly priced, built to code.

View Our Work
Service SpecsWD-S06
Duration
2–8 Months
Scope
ADU / Extension
Permits
Managed In-House
What's Included

Every ADU Type
Built to Code

An ADU project through Warren Development covers every phase — site assessment, permits, foundation, framing, mechanicals, and interior finishes. Detached, attached, garage conversion, or Junior ADU — one team, one contract.

  • 01

    Site Assessment

    Full lot survey, setback analysis, and feasibility check against Santa Monica's ADU ordinance before design starts.

  • 02

    Permits & Zoning

    Building permit and zoning review handled with the Santa Monica planning department. No third-party expediter.

  • 03

    Foundation & Utilities

    Slab or raised foundation with new electrical, water, sewer, and gas service run to the ADU.

  • 04

    Framing & Envelope

    Structural framing, roofing, siding, windows, and doors. Weather-tight before interior work begins.

  • 05

    Interior Finishes

    Kitchen, bath, flooring, cabinetry, and fixtures specified and installed to match your primary home.

  • 06

    Handoff & Occupancy

    Final walkthrough, punch list, and city inspections. Ready for occupancy or rental on day one.

How It Works

Four Phases No Surprises

Every ADU project runs the same way — clear estimate, permits secured, coordinated build, walkthrough at handoff.

  1. 01

    Step 01 of 04

    Consultation & Feasibility

    We walk the lot and check your project against Santa Monica's ADU rules — setbacks, size limits, parking, coastal-zone if applicable. You get a real scope and budget before design starts.

    DeliverableFeasibility Report
  2. 02

    Step 02 of 04

    Design & Permits

    We finalize plans, run structural, and file permits with the city. Every fixture and finish confirmed before construction begins.

    DeliverableApproved Permits
  3. 03

    Step 03 of 04

    Construction

    Foundation, framing, mechanicals, and interior finishes managed in sequence by our team. One on-site PM from kickoff to handoff.

    DeliverableBuilt On Schedule
  4. 04

    Step 04 of 04

    Walkthrough & Handoff

    Final punch list, city inspection, and warranty handoff. Your ADU is ready for occupancy or rental on day one.

    DeliverableCertificate of Occupancy
Selected Work

Recent ADU Builds
Across The Westside

View All Projects
Start a Project

Your details stay private.

Ready to Build

Ready to Build
Your ADU?

Send a few project details through the form, or reach us directly Sunday through Saturday, 6am to 7pm. We'll walk the lot with you and put together a clear estimate — no pressure, no obligation.

  • Open — Sunday to Saturday, 6am to 7pm
  • Free on-site quotes — no obligation
  • Licensed, insured & bonded — cert on request
  • Honest pricing on every project
  • 1-year workmanship warranty included

\ FAQ /

ADU
Questions Answered

Five answers to the questions homeowners ask most when planning an ADU across Santa Monica and the Westside.

  1. 01

    How much does an ADU cost in Santa Monica?

    Answer

    ADUs in Santa Monica through Warren Development typically range from $200,000 to $600,000+ depending on square footage, whether it's detached or a conversion, and finish tier. Westside labor and material pricing runs higher than national averages — a Junior ADU on an existing footprint sits at the lower end; a detached 1,200 sq ft ADU with custom finishes at the upper end.

  2. 02

    How long does it take to build an ADU?

    Answer

    Most ADUs in Santa Monica take 4 to 8 months from permit approval to certificate of occupancy. Add roughly 2 to 4 months for design, structural, and permit review with the city before construction starts. Detached ADUs run longer than garage conversions or Junior ADUs.

  3. 03

    Do I need a permit to build an ADU in Santa Monica?

    Answer

    Yes. Every ADU requires a building permit, and detached ADUs additionally trigger zoning review for setbacks, height, and parking. California state law (AB 68 and follow-ons) simplified the review process, but Santa Monica still enforces its own local standards. We handle the entire process with the city planning and building departments.

  4. 04

    Can I rent out my ADU?

    Answer

    Yes — California law now permits ADUs to be rented separately from the primary residence, and Santa Monica allows both long-term and short-term rentals subject to STR restrictions. ADUs cannot be sold separately from the main property. We can talk through rental viability during consultation.

  5. 05

    What's the difference between a detached ADU, attached ADU, and Junior ADU (JADU)?

    Answer

    A detached ADU is a standalone structure — like a small house on the same lot. An attached ADU shares at least one wall with the main home. A Junior ADU (JADU) is under 500 sq ft, sits inside the primary home's footprint, and can share a bathroom with the main house. Each has different rules for parking, size limits, and setbacks.

Service Area

ADUs Built
Across The Westside

We build ADUs across nine cities on the Westside and greater LA. Free on-site quotes anywhere in our coverage zone.

  • Santa Monica
  • Brentwood
  • Pacific Palisades
  • Westwood
  • Beverly Hills
  • Venice
  • Malibu
  • Calabasas
  • Marina Del Rey
MapWestside Los Angeles
Live