Luxury kitchen remodel by Warren Development
  • Licensed & Insured
  • AIA Affiliated
  • Santa Monica, CA

Kitchen Remodeling
In Santa Monica

Warren Development designs and builds kitchens that perform as well as they look — across Santa Monica, Beverly Hills, Brentwood, and the Westside. Every phase from demolition to final installation, with transparent pricing and a 1-year workmanship warranty on every project.

Service SpecsWD-S04
Duration
6–16 Weeks
Scope
Demo to Finish
Permits
As Required
Warranty
1-Year Workmanship

What's Included

Demo to Finish
Every Detail Covered

A kitchen remodel through Warren Development is a full-scope renovation — not a surface refresh. Demo through final installation, every trade coordinated so you don't have to.

  • 01

    Demolition

    Full tear-down and debris removal. We open the space cleanly so what gets built next holds for decades.

  • 02

    Cabinetry

    Custom cabinetry sourced and installed by finish carpenters. Layout, hardware, and concealed pulls handled in-house.

  • 03

    Countertops

    Stone, quartz, or butcher-block — fabrication, templating, and seam-precise installation done right the first time.

  • 04

    Plumbing

    Licensed rough-in through trim-out. Sink, faucet, dishwasher, and pot-filler hookups handled in-house.

  • 05

    Electrical

    Lighting layout, under-cabinet circuits, and outlet placement brought up to current code with concealed routing.

  • 06

    Walkthrough

    Final review and punch list before handover. Your 1-year workmanship warranty starts the day you sign off.

How It Works

Four Phases No Surprises

Every kitchen remodel runs the same way — clear estimate, locked selections, coordinated build, walkthrough at handoff.

  1. 01

    Phase 01 of 04

    Consultation & Estimate

    Call or reach out and we'll schedule a time to walk your existing kitchen. We discuss what you want, what the space allows, and what it costs — before any design decisions get locked in.

    DeliverableSigned Estimate
  2. 02

    Phase 02 of 04

    Design & Material Selection

    We work through the layout, finishes, and materials with you. Cabinetry, countertops, fixtures — every selection confirmed before construction begins.

    DeliverableLocked Selections
  3. 03

    Phase 03 of 04

    Construction & Installation

    Demo, rough work, cabinetry, countertops, appliances. Our team manages every trade and keeps the project on schedule. One point of contact throughout.

    DeliverableBuilt On Schedule
  4. 04

    Phase 04 of 04

    Walkthrough & Warranty

    We walk the completed kitchen with you, review every detail, and hand it over with a 1-year workmanship warranty.

    DeliverablePunch List Cleared

Selected Work

Recent Kitchen
Projects Across The Westside

View All Projects
WD-04Start a Conversation
Receiving

Submitting consents to contact about your project. Details stay private.

Ready to Build

Ready to Rebuild
Your Kitchen?

Send a few project details through the form, or reach us directly Monday through Friday, 8am to 6pm. Either way, we'll walk the space with you and put together a clear estimate — no pressure, no obligation.

  • Open — Monday to Friday, 8am to 6pm
  • Free on-site estimates — no obligation
  • Licensed, insured & bonded — cert on request
  • Honest pricing on every project
  • 1-year workmanship warranty included

Common Questions

Kitchen Remodel
Questions Answered

Five answers to the questions homeowners ask most when planning a high-end kitchen remodel across Santa Monica and the Westside.

  1. 01

    How much does a kitchen remodel cost in Los Angeles?

    Answer

    Kitchen remodel costs vary based on size, materials, and scope. High-end renovations in the Los Angeles market run significantly higher than national averages due to material costs, labor, and permit requirements. We give you a real number after walking your space — not a figure from a calculator. Call us for a free estimate.

  2. 02

    How long does a kitchen remodel take?

    Answer

    Most kitchen remodels run between 6 and 16 weeks depending on scope and material lead times. We set a clear timeline at the start and keep you updated throughout. Cabinetry and stone fabrication are usually the longest-lead items, and we lock those orders before demo begins.

  3. 03

    Do I need to move out during the remodel?

    Answer

    In most cases you can stay in your home. Access to the kitchen will be limited during certain phases — we'll set up a temporary cooking and washing area when needed and walk you through the schedule during consultation.

  4. 04

    Do you handle permits for kitchen remodels?

    Answer

    Permit requirements depend on scope — particularly if structural, electrical, or plumbing changes are involved. We evaluate what's needed for your project during the estimate and manage the permit process when it's required.

  5. 05

    What areas do you serve?

    Answer

    Santa Monica, Brentwood, Pacific Palisades, Westwood, Beverly Hills, Venice, Malibu, Calabasas, and Marina Del Rey — within a 25-mile radius of our Santa Monica office.

Service Area

Kitchen Remodels
Across The Westside

We build kitchens across nine cities on the Westside and greater LA. Free on-site estimates anywhere in our coverage zone.

  • Santa Monica
  • Brentwood
  • Pacific Palisades
  • Westwood
  • Beverly Hills
  • Venice
  • Malibu
  • Calabasas
  • Marina Del Rey
MapWestside Los Angeles
Live